We dropped by the house last week, but the kitchen company was working that day and wouldn't let us in the house. We went back today, and they were all finished. The cabinetry for the kitchen and both upstairs bathrooms is complete.
Just under a month until closing!
Kitchen - We asked them not to install any hardware because we'll be buying the rod-type handles and installing them ourselves. The 4 skinny cabinet doors right beside the entryway is a 24" deep pantry.
Kitchen - Good shot of the fridge gable.
Kitchen - This pic shows the pots and pans drawers as well as the piano-hinge cabinet in the lower corner.
Main bathroom
Ensuite bathroom - Cabinets are the same colour as our kitchen.
Tuesday, April 17, 2007
Monday, April 2, 2007
Still Going...
Progress continues to be made on the house. The tiling was completed last week, and the carpenter/woodworking guys are currently in the house completing the trimwork. Here are some pics.
One decorative column is done. As we were leaving, the tradesman was bringing the second one into the house.
Tiling completed in the kitchen.
Main bathroom.
Ensuite tub and shower stall.
One decorative column is done. As we were leaving, the tradesman was bringing the second one into the house.
Tiling completed in the kitchen.
Main bathroom.
Ensuite tub and shower stall.
Subscribe to:
Posts (Atom)